BLM/BIA FMG RMPA/EIS

4. BLM Alternatives

Liil Neilozi (BLM) Binahat’ah Alkeesiniligiih

Summary of BLM Alternatives

No Action Alternative

  • Continues management direction in 2003 RMP

  • Goals and objectives for BLM-managed surface lands and federal minerals would not change

  • Appropriate and allowable uses and restrictions would remain the same

  • No stipulations or closures around CCNHP boundary or Chacoan roads and outliers

 

Liil Neilozi (BLM) Binahat’ah Alkeesiniligiih

Listen to information about this virtual open house station in Navajo.

4. BLM Alternatives

Alternative A

  • Focus on enhancing habitats with measures designed to support natural ecosystems; greatest number and extent of measures

  • Integrates adaptive management and prioritizes natural and nonrenewable resource programs

  • Vegetation managed to support resiliency

  • Closure and NSO stipulations around and outside CCNHP boundary

Alternative B

  • Focus on preservation of Chacoan and cultural landscapes

  • Prioritize cultural and paleontological properties, including specific measures proposed by stakeholders

  • Sub-Alternatives B1 and B2 would involve closures to oil and gas leasing for varying distances around the CCNHP and the boundaries of Pueblo Pintado and Kin Bineola

Alternative C (Preferred Alternative)

  • Focus on balancing community needs and development while enhancing land health

  • Emphasis on tribal and local perspective of the landscape

  • Sub-Alternatives C1-C6 involve:

    • NSO stipulations and closures to oil and gas leasing for varying distances around the CCNHP boundary and boundaries of Pueblo Pintado and Kin Bineola

Alternative D

  • Maximize resources that target economic outcomes while sustaining land health

  • Promotes development of fluid mineral resources

  • Would emphasize other multiple uses as a priority over protecting wilderness characteristics

  • No closures or stipulations to areas around CCNHP boundary or Chacoan roads and outliers


Next Station

 

For more information on the Draft FMG RMPA/EIS, please contact Sarah Scott (505-564-7689) or Robert Begay (505-863-8515).

If you have questions about the Draft FMG RMPA/EIS or wish to be added or removed from the mailing list, please email  blm_nm_ffo_rmp@blm.gov.